It's that time of year again for our annual freeze protection reminders. As you know, winter can bring extremely cold weather conditions, especially in Canada, the Northeast, Midwest, and Upper Midwest. To reiterate what we have been saying for years, here are a few things to consider to protect your rental boiler and auxiliary equipment (deaerators, water softeners, etc.) from damage due to freezing temperatures this winter.
1. If you are renting a trailer or skid-mounted firetube or watertube boiler and installing the unit outdoors, these systems are completely exposed to the environment. User's should consider enclosing the front and/or the rear end of the boiler, or build a temporary enclosure around the entire system. An external heating source should also be used.
2. Install the proper heat tracing (steam or electric) and insulation on all main lines and piping components, regardless of whether the boiler (or auxiliary equipment) is in operation or sitting as stand-by. This should include the following lines:
- Sensing lines for all transmitters
- Primary and auxiliary low-water cut-offs
- Water column and connected piping
- Bottom blowdown and surface blow-off piping, depending on the length of the piping runs. These valves should also be left open.